Designing project can be completed in a few stages. Number of stages is outlined by regulatory documents, and depends on the project complexity.
Draft design (DD)
Land allocation is performed on the basis of DD.
Documentation at the DD stage can be approved in all corresponding local institutions and is agreed with the Customer (at request)
Project (P)
Based on approved on stage P documentation, the construstion works permit is issued.
Documentation to be submitted is memorandum and graphic items.
Documentation at the P stage is approved in the corresponding state institutions and agreed in UKRINVESTEXPERTIZA office.
Production documentation (PD)/ Production forms and records
The documentation is based on one approved on P stage. The PD stage documentation is final and effective for implementation.
Production project (PP)
The PP stage implies direct construction activities for low-complexity projects. PP is developed to outline specific planning, architectural, artistic, ecological, technical solutions.
Documentation package to be submitted on the PP stage includes memorandum and graphic representation of the decisions made, at the final phase it is approved in accordance with standard procedures (similar to P stage). The list of documentation is the same as that on stages P and PD.
Project stages are defined by local town planning and architectural authorities depending on the complexity of object being designed.
Project documentation approval
The Customer presents project documentation for approval.
Engineering organization performs:
- Presentation of the design plans and specification at public case hearings;
- Presentation and defense of the design plans and specification at City Construction Councils;
- Defense and approval of the design plans and specification at P and PP stages in institutions issuing technical requirements.
- Advocacy of the project design (solutions) at State Expertise Service.